(WARNING: Water Rights makes NO claims as to the accuracy of this data.) RUN DATE: 05/13/2024 RECOVERY APPLICATION NUMBER: RC006-001 (which is based on RECHARGE PERMIT NUMBER: RC006) ------------------------------------------------------------------------------------------------------------------------------------ APPLICANTS************************************************************************************************************************** ------------------------------------------------------------------------------------------------------------------------------------ NAME: Weber Basin Water Conservancy District ADDR: Attn: Scott W. Paxman and Jon Parry 2837 East Highway 193 Layton, Utah 84040 ------------------------------------------------------------------------------------------------------------------------------------ APPLICATION PROCESSINGS DATES, ETC.************************************************************************************************* ------------------------------------------------------------------------------------------------------------------------------------ FILED: 08/17/2009|PUB BEGAN: 09/17/2009|PUB ENDED: 09/24/2009|NEWSPAPER: Standard Examiner ProtestEnd:10/14/2009|PROTESTED: [No ]|HEARNG HLD: |SE ACTION: [Approved]|ActionDate:04/07/2020|PROOF DUE: EXTENSION: |PROOF SUBM: |CERT ISSUE: |LAP, ETC: |LAPSE LETR: RECON REQ: 02/21/2014|TYPE: [ ] Status: Approved ------------------------------------------------------------------------------------------------------------------------------------ QUANTITY OF WATER TO BE RECOVERED*************************************************************************************************** ------------------------------------------------------------------------------------------------------------------------------------ FLOW: 3212.0 acre-feet SOURCE AQUIFER: Weber River Basin/Weber River Delta COUNTY: Weber COMMON DESCRIPTION: Service area of WBWCD ------------------------------------------------------------------------------------------------------------------------------------ DESCRIPTION OF PROPOSED PROJECT*** MAP VIEW ************************************************************************************* For Additional Project Information, CLICK HERE ------------------------------------------------------------------------------------------------------------------------------------ POINT OF RECOVERY -- UNDERGROUND: (If link is present, it indicates additional well data is available.) (1) S 150 ft W 50 ft from N4 cor, Sec 07, T 4N, R 1W, SLBM DIAMETER OF WELL: 20 ins. DEPTH: 0 to 902 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: Clearfield No 2 (2) S 2247 ft E 3842 ft from NW cor, Sec 08, T 4N, R 1W, SLBM DIAMETER OF WELL: 20 ins. DEPTH: to 802 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: Laytona (3) S 908 ft E 301 ft from NW cor, Sec 10, T 4N, R 1W, SLBM DIAMETER OF WELL: ins. DEPTH: 0 to 990 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: Fairfiled (4) S 10 ft E 45 ft from N4 cor, Sec 18, T 5N, R 1W, SLBM DIAMETER OF WELL: 20 ins. DEPTH: 0 to 730 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: Riverdale (5) N 2239 ft W 629 ft from SE cor, Sec 19, T 5N, R 1W, SLBM DIAMETER OF WELL: ins. DEPTH: 0 to 1002 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: District Well No 3 (6) S 1100 ft E 1100 ft from NW cor, Sec 19, T 5N, R 1W, SLBM DIAMETER OF WELL: ins. DEPTH: 0 to 950 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: District Well No 2 (7) N 110 ft W 260 ft from SE cor, Sec 20, T 5N, R 1W, SLBM DIAMETER OF WELL: ins. DEPTH: 0 to 350 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: South Weber No 1 (8) S 618 ft W 60 ft from N4 cor, Sec 33, T 5N, R 1W, SLBM DIAMETER OF WELL: ins. DEPTH: 0 to 1208 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: South Weber No 2 (9) N 0 ft E 0 ft from W4 cor, Sec 36, T 5N, R 2W, SLBM DIAMETER OF WELL: 20 ins. DEPTH: 0 to 995 ft. YEAR DRILLED: WELL LOG? NO WELL ID#: Pumping Capacity: Designed Pumping Capacity: Comment: Clearfield No 1 ------------------------------------------------------------------------------------------------------------------------------------ USES OF RECOVERY PROJECT************************************************************************************************************ ------------------------------------------------------------------------------------------------------------------------------------ .................................................................................................................................... ###MUNICIPAL: Weber Basin Water Conservancy District PERIOD OF USE: 01/01 TO 12/31 ------------------------------------------------------------------------------------------------------------------------------------ OTHER COMMENTS********************************************************************************************************************** ------------------------------------------------------------------------------------------------------------------------------------ A detailed hydrologic study and recharge pilot test report has been prepared by the Utah Geologic Survey and Weber State University entitled The Weber River Basin Aquifer Storage and Recovery Pilot Project . A complete copy of the report was submitted as Attachment D to the Recharge Permit Application for this project. Recovery of the recharged water will be via existing Weber Basin WCD wells. Groundwater modeling has been conducted to determine the groundwater in the deep regional Delta and Sunset aquifers. Figure 1 shows the location o the project. Figure 2 shows the location of the recovery wells and the estimated groundwater time of travel or storage time in the aquifers for recharge water from the project. Groundwater modeling results indicate the recharge water is available for recovery by the District s wells for at least 5 years. It is proposed the recovery permit be written to allow Weber Basin to store the recharged water for up to 5years before recovery at its wells. ************************************************************************************************************************************ *******************************************************E N D O F D A T A******************************************************** ************************************************************************************************************************************